Wood to Composite Deck Replacement in Austin, TX

Home/Services/Composite Decking/Wood to Composite Replacement

Quick Answer

Wood-to-composite deck replacement means removing your aging wood deck entirely, framing included, and rebuilding it with new footings, new joists, composite decking and new railings. It's the right call when the structure is rotted, unsafe or poorly laid out. Green Hill Remodeling handles demo, haul-off and the full rebuild across Austin. Call (737) 529-4322 for a free on-site estimate.

Full Tear-Out and Rebuild

When Your Wood Deck Has Reached the End

A wood deck in Central Texas lives a hard life. Summer heat bakes it, storms soak it, live oak leaves hold moisture against it, and termites look for any soft spot near the ground. After enough years, the problems stop being cosmetic. Posts rot at grade, joists sag, ledger connections loosen and railings wobble. At that point new boards alone won't fix anything, and the smartest investment is a deck built from the footings up.

Full replacement means we remove everything, haul it off, and rebuild with new footings, new pressure-treated framing sized and spaced for composite, and a composite surface with matching railings and stairs. Because nothing from the old structure carries over, you're free to change the footprint, height, shape and stair location. Many homeowners treat replacement as the moment to finally get the deck they wanted in the first place, instead of the one a previous owner built.

With 15+ years of deck construction behind us in Austin, Round Rock, Georgetown, Kyle and the Hill Country, we know what a failing deck looks like and what a lasting one requires. A dedicated project manager runs your job from demo day to final walk-through, and our licensed, insured crews build to the adopted building code. Free on-site estimates and design consultations come with every project, and financing is available.

15+Years Building
5★Rated Service
100%Licensed & Insured
Wood to Composite Deck Replacement in Austin, TX

Why Replace With Composite

What a New Composite Deck Changes

Swapping wood for composite isn't just a material change. It resets the clock on the entire structure, from footings to handrails.

A Brand-New Structure

New footings, posts, beams and joists mean no hidden rot, no mystery repairs and a frame built specifically to support composite decking.

Years of Skipped Chores

Wood needs regular sanding, staining and sealing to survive Texas weather. Composite needs periodic washing, which frees up weekends once spent on upkeep.

Safer Railings and Stairs

New guards, handrails and stairs are built to current IRC requirements for height, opening size and stair geometry, replacing wobbly rails and uneven steps.

A Better Layout

Starting over lets you widen the deck, add a second level, relocate the stairs or reshape the footprint to fit how you actually use the yard.

Built to Handle UV

Capped composite resists the fading, checking and splintering that intense Central Texas sun inflicts on bare or stained wood decking year after year.

No Splinters, No Rot

Composite boards won't rot or splinter and resist termites, which matters for kids, pets and bare feet heading to the pool or hot tub.

Replacement Options

What Goes Into a Full Replacement

Each replacement is designed around your yard, your house and how you live outside. These are the main decisions we make together.

Demolition and Haul-Off

We remove decking, railings, stairs, framing and old footings where needed, protect landscaping and siding during tear-out, and haul all debris away so the site is clean before the new build starts.

New Footings and Framing

Footings are sized for your soil, whether that's shifting clay or Hill Country limestone. Framing is pressure-treated lumber spaced for composite, finished with joist tape and a properly flashed ledger.

Composite Decking Lines

Choose from Trex Transcend, Enhance and Select, among others. Lines differ in color depth, grain texture and cap performance, and we bring samples so you can see them in your own backyard light.

Railing Systems

Composite railings to match the boards, powder-coated aluminum for a slim profile, or cable rail to keep the view open. Every guard is built to the height and opening rules of the IRC.

Layout Upgrades

Multi-level decks, wider stairs with landings, built-in benches, picture-frame borders, angled corners and room planned for a future shade structure. Replacement is the easiest moment to change the deck's shape.

Pergolas and Patio Covers

Pair the new deck with a pergola, louvered aluminum pergola or patio cover. Planning it during replacement lets us size footings and framing for the added load from the start.

Recent Green Hill Projects

Backyard deck and outdoor living space in Austin, TX by Green Hill Remodeling
Backyard deck and outdoor living space in Austin, TX by Green Hill Remodeling
Backyard deck and outdoor living space in Austin, TX by Green Hill Remodeling

Our Process

From Tear-Out to Final Walk-Through

A replacement project has more moving parts than a resurfacing job. Here's how we keep it organized from start to finish.

Assessment and Design

We evaluate the existing deck, soil, slope and house attachment, then design the new layout with you, including size, levels, stairs, railings and composite colors.

Permitting and Scheduling

We build to the adopted building code and guide you through permitting where it's required, plus HOA submittals in neighborhoods like Steiner Ranch, then set a schedule with your project manager.

Demo and Structural Build

The old deck comes out and is hauled off. New footings, posts, beams and joists go in, with joist tape on every joist and a flashed, properly fastened ledger.

Composite Surface and Railings

Decking, borders, stairs and railings are installed to manufacturer specifications. Your project manager walks the finished deck with you and covers care basics before closing out the job.

Built for Central Texas

Why Wood Decks Fail Here, and How We Build the Replacement

Wood decks around Austin tend to fail for the same handful of reasons: posts buried in soil or concrete that trapped water and rotted at grade, footings that moved with expansive clay, ledgers nailed to the house with no flashing, and joists softened by years of moisture under shade trees. Termite damage usually shows up closest to the ground. Recognizing those patterns tells us exactly what to do differently when we build the new structure.

On replacement builds, we size footings for local soil and slope, set posts on proper bases above grade, fasten ledgers with code-approved bolts or structural screws behind flashing, and tape every joist top. Framing is spaced for composite from day one, so boards stay flat through August heat. The capped composite surface then handles UV, hail-season storms and leaf litter far better than wood, giving you a deck that ages slowly rather than quickly.

  • Footings sized for clay soil, limestone and slope
  • Posts kept off the ground on approved post bases
  • Ledger flashed and bolted to the house rim joist
  • Joists spaced for composite and protected with butyl tape
  • Guards at least 36 inches tall, typically, per the IRC
  • Stairs built to IRC riser, tread and handrail requirements

FAQ

Wood to Composite Replacement Questions, Answered

How do I know if my deck needs replacing instead of resurfacing?

Warning signs include soft or spongy spots, posts rotting at the ground, sagging joists, a ledger pulling away from the house, rusted hardware, wobbly railings and termite damage. If more than a few framing members are compromised, or the deck has moved out of level, full replacement is usually more sensible than patching. We'll inspect and give you a straight recommendation.

How does maintenance compare between wood and composite over the life of the deck?

A wood deck in Central Texas generally needs cleaning plus re-staining or sealing every couple of years, along with periodic board replacement and fastener resets as it ages. Composite typically needs only washing with soap and water a few times a year to remove pollen, leaves and dirt. Over a decade or more, that difference adds up to many weekends and refinishing bills.

Is composite worth the higher upfront cost?

Composite usually costs more than pressure-treated wood to install, but it removes most recurring staining, sealing and board-replacement expenses. Over the life of the deck, many homeowners find the total cost gap narrows considerably. Boards come with a manufacturer-backed warranty, and financing is available if you'd like to spread out the investment.

What happens to my old deck during demolition?

Demolition and haul-off are part of the project. Decking, railings, framing and hardware are removed and taken away, and we protect nearby siding, windows and landscaping during tear-out. Where old footings can't be reused for the new layout, we remove or abandon them properly so they don't interfere with the new structure.

Can I change the size or shape of my deck during replacement?

Yes, and it's the best time to do it. Since the structure is rebuilt from scratch, we can enlarge the deck, add levels, move stairs, add a landing or plan for a future pergola. Changes may affect setbacks, HOA approval or permitting, and we'll walk you through those considerations during design.

Will a new composite deck get too hot in the Texas sun?

Any decking gets warm in direct summer sun, and composite can run hotter than wood. Lighter colors generally stay cooler than dark ones, and some product lines are designed specifically to reduce heat buildup. Shade from a pergola, patio cover or mature trees makes a big difference, and we'll bring samples so you can compare before you commit.

Get Started

Ready to Replace Your Wood Deck?

Get a free on-site estimate and design consultation for your new composite deck. Call (737) 529-4322 or request a visit, and we'll start by assessing your existing structure.

✓ Free on-site estimatesLicensed & insured15+ years in Central Texas(737) 529-4322View all services →